基于线性回归和灰狼优化的电力工程成本及工期预测方法
徐宁, 李维嘉, 洪崇, 刘云, 周波
Cost and duration prediction of power engineering projects based on linear regression and grey wolf optimization
XU Ning, LI Weijia, HONG Chong, LIU Yun, ZHOU Bo
沈阳工业大学学报
.
2025, (3): 295
-301
.
DOI: 10.7688/j.issn.1000-1646.2025.03.04